S.No |
Package |
Bid Document* |
Date of issue of tender Documents |
Last date of Bid Submission |
| 1 |
Erection of
Boiler and TG auxiliaries |
Download |
08.12.2009 |
22.12.2009 |
11.01.2010 |
| 2 |
Civil and
Structural Works for Main Plant |
Download |
03.11.2009 |
17.11.2009 |
08.12.2009 |
| 3 |
Induced Draft
Cooling Towers |
Download |
11.11.2009 |
25.11.2009 |
16.12.2009 |
| 4 |
Coal Handling
Plant |
Download |
03.11.2009 |
18.11.2009 |
08.12.2009 |
| 5 |
Ash Handling
System |
Download |
11.11.2009 |
25.11.2009 |
16.12.2009 |
| 6 |
Chimney (twin
flue) |
Download |
17.11.2009 |
30.11.2009 |
21.12.2009 |
| 7 |
Water
Treatment & Effluent Treatment Plant |
Download |
01.12.2009 |
16.12.2009 |
05.01.2010 |
| 8 |
Circulating
Cooling Water System |
Download |
09.01.2010 |
23.01.2010 |
13.02.2010 |
| 9 |
EOT Cranes for
Turbine-Generator Building |
Download |
16.12.2009 |
31.12.2009 |
15.01.2010 |
| 10 |
Air
Conditioning and Ventilation System |
Download |
01.12.2009 |
16.12.2009 |
05.01.2010 |
| 11 |
Switchyard and
Electrical BOP |
Download |
16.12.2009 |
31.12.2009 |
20.01.2010 |
| 12 |
Compressed Air
System |
Download |
25.12.2009 |
07.01.2010 |
28.01.2010 |
| 13 |
Mechanical BOP
(Fuel Oil System & LP Piping) |
Download |
01.01.2010 |
16.01.2010 |
05.01.2010 |
| 14 |
Fire Water,
Fire Protection and Fire detection System |
Download |
01.01.2010 |
16.01.2010 |
05.01.2010 |
| 15 |
Miscellaneous
Civil & Structural works |
Download |
01.01.2010 |
16.01.2010 |
05.01.2010 |