Gujarat Solar Power
GMR Energy set up its first solar power plant on March 4, 2012 at Charanka, Patan district in Gujarat. This 25 MW solar power plant uses crystalline solar photovoltaic modules. On December 8, 2010, the plant entered into a 25-year PPA with Gujarat Urja Vikas Nigam Limited ("GUVNL") with respect to the entire power generated from the Patan Power Plant.